Lump sum project for the replacement of obsolete ESD and auxiliary systems with new process automation systems.
The project consists of the following:
- Installation of new ESD TMR system and DCS equipment in Process Control House (PCH) for V11-C1A/B and demolish the obsolete ESD and control relay panels;
- Installation of new DCS cabinets, DCS consoles, TMR cabinets, RPMS system servers and computer cabinets in Process Control House (PCH) and Process Interface Building (PIB).
- Installation of CCTV monitors and VESDA smoke detection systems in PCH;
- Installation of UPS in the marine terminal building;
- Installation of new PLC, flow computers, DCS panels and consoles to replace the marine metering control system and DCS in the marine building;
- Installation of remote DCS I/O cabinets in Substations 1, 2, 3 & 4;
- Installation of new fiber optic networks to link the marine DCS and the tank farm control room;
- Installation of field instruments comprises of control valves, transmitters, petitioners, I/P Converters, etc.;
- Replacement of obsolete pneumatic controllers and instrumentation;
- Power, instrument and fiber optic cabling works.