Scope of work
LSPB project for the installation of major electrical and control system equipment, cable trays, conduits and wireways, cable, wire, conduit and fixtures, connections, terminations, testing and pre-commissioning of all electrical and control systems.
Yanbu Gas Plant
- Install six new Honeywell GUS stations and tabletops in the new console arrangement in the central control room;
- Install 13 HPMs in the satellite instrument houses
- Install 10 TMRs in the satellite instrument houses;
- Install 13 UPS systems and batteries in substations;
- Install Burner Management System for boilers;
- Upgrade 2 ABB Vista workstations for the analyzers;
- Integrate MOA data highway # 5 to Honeywell TDC-3000;
- Modification of boiler nozzles to suite sales gas services;
- Replace the obsolete pneumatic controllers and instrumentation;
- Power, instrument and fiber optic cabling works;
- Conduits, junction boxes, pull boxes installation to lay the cables;
- Installation of cable trays; structural supports, etc.;
- Structural supports to UPS, DCS and marshalling cabinets;
- Pre-commissioning assistance to the vendors provided by Saudi Aramco
Yanbu Crude Oil Terminal
- Replace existing SCADA and metering systems at YCOT;
- Replace existing remote I/O mux houses with local marshalling cabinets;
- Install new PLC cabinets at pump control and receiving metering control buildings;
- Power and instrument cabling works;
- Conduits pull boxes installation to lay the cables;
- Installation of cable trays; structural supports, etc.;
- Pre-commissioning assistance to the vendors provided by Saudi Aramco.
East/West Pipeline
- Install densitometer RTUs c/w shades;
- Install 22 protocol converters at pump stations and PRS-1;
- Replace two ultrasonic flow meters at KP-1010;
- Power and instrument cabling works;
- Conduits pull boxes installation to lay the cables;
- Pre-commissioning assistance to the vendors provided by Saudi Aramco.