Project Description
Scope Of Work
LSPB project for the construction of new waste water treatment facility including oily waste water treatment and disposal systems at Jeddah Refinery and Marine Area.
The project consists of procurement, installation, construction, testing, pre-commissioning and commissioning of the following:
- One new lift station with three nos. of oily waste water pumps.
- One storm surge/off-spec storage basin and three new storm water pumps.
- One new aboveground API separator equipped with bottom solids removal hopper, T-Disk type oil skimmers and all appurtenances and accessories.Electrical Distribution Systems at Saudi Aramco, Safaniya, Tanajib, Ras Tanura Refinery and Al-Hassa.
- One new aboveground box with all appurtenances and accessories.
- Two new aboveground open room skim tanks with all appurtenances and accessories.
- One new aboveground open roof storm water storage tank with all appurtenances and accessories.
- One new walnut shell filter skid along with all interconnecting piping and accessories.
- One new filter feed pump station with three feed pumps.
- One new aboveground filter backwash thickner tank with raker/ scapper mechanism.
- Two nos. aboveground API sludge decant tank with raker/ scrapper mechanism.
- One new aboveground filtered/potable water tank.Two new filter potable water pumps.
- Two sludge holding tanks.Two new API sludge pumps.Two new skimmed oil pumps.
- Two new slop oil pumps for replacing the existing pumps.
- Four new storm water pumps for replacing existing pumpsTwo new floating oil skimmers for the skim tanks.
- One new diesel generator unit with self contained storage tank.New DCS system for the waste water treatment plant.
- One new UPS system.
- One new controlgear and one new Automatic Transfer Switch.