Project Description
Scope of work
LSTK Project involving design, Engineering, Procurement, Construction and Commissioning.
The work includes; replacement of 34.5 kV multi way oil filled switches and 34.5 kV power transformers at Tanajib marine facility with a 13.8 kV looped distribution system comprising of 34.5 kV/13.8 kV step down transformer, 34.5 kV outdoor circuit switcher, outdoor 13.8 kV pad mounted SF6 compact switchgears and loop feed 13.8 kV/ .48 kV pad mounted distribution transformers. In addition replacement of existing 13.8 kV oil filled switches at Safaniya substation # 8 with a new 13.8 kV pad mounted SF6 outdoor switch fuse unit and obsolete 4.16 kV switchgears of Tanajib central utilities plant substations with new 4.16 kV switchgear.