Project Description
Scope of work
Demolition of the existing substation having 2 each 13.8KV, 2400KVA transformer, 2 each 480V double ended switchgears 3000A, bus ducts, etc. Construction of a new substation of the same rating including new transformers, switchgears, busduct with enhanced short circuit rating. The work also includes the installation of 15KV grade cables from the existing MC switchgear, termination, testing and commissioning of the Substation, etc. Installation of ground grid around Substation, all utilities like HVAC, fire protection, lighting, etc.