Project Description

Scope Of Work

LSPB project for upgrading of the drinking water production facilities at Dhahran and Dammam. Dhahran Drinking Water Plant (DWP) will produce an average flow of 1,100 gpm and it is proposed to install three (3) Reverse Osmosis (RO) skids of spiral wound membranes, three (3) feed pumps, three (3) product pumps, three (3) degasifiers and a substation building to accommodate electrical equipment.

At Dammam Office Building complex (DOB), two (2) RO skids of spiral wound membranes will be installed, to produce an average flow of 90 gpm. The existing RO skids at both plants will be dismantled and disposed. Also, the contract includes construction of an 18-inch dia. 3,760 meter transmission pipeline (RTR) from the new drilled wells in Dhahran Hills to Dhahran DWP.

The project consists of procurement, installation, testing, pre-commissioning and commissioning of the following:

Dhahran Drinking Water Plant (DWP)

  • Replace nine (9) existing Reverse Osmosis (RO) skids with three (3) ROs (Spiral Wound Technology)
  • Replace three (3) RO Booster Pumps
  • Installation of three (3) R.O Feed Pumps
  • Installation of four (3) Product Transfer Pumps
  • Installation of three (3) Turbo Booster Pumps
  • Replace two (2) Backwash Air Blowers
  • Replace existing Cleaning in Place (CIP) Systems
  • Upgrade existing Chemical Treatment Systems
  • Replace three (3) Degassifier Tower with 3 new Degassifier Tower
  • Construction of new three (3) Degassifier Sumps
  • Installation of Calcium Calcite Column and BW Pumps
  • Installation of one (1) Flushing Pump
  • Installation of Vibration isolators for all rotating equipment and HVAC
  • Construction of MCC Building
  • Installation of PLC Control system console in the existing CR.
  • Construction of Storage area inside the RO Unit
  • Installation of Control System for the new facility
  • Installation of Transformer – 1000KVA & 75 KVA 2 Ea (Well Area)
  • Installation of SF 6 Switchgear 2 Ea (Well Area)
  • Installation of MCC 2.4 KVA 2 Ea (Well Area)
  • Installation of Natural Ground Resistor 2 Ea (Well Area)
  • Demolition work
  • Installation of RTU for new water wells
  • Installation of 4.4 km RTR piping to connect wells and RO units
  • Installation of area lighting

Dhahran Drinking Water Plant (DWP)

  • Installation of new RO Skids
  • Installation of Skid Mounted Feed Pumps
  • Installation of CIP (Clean In Place) System
  • Upgrade Chemical Treatment System
  • Installation of Cartridge Filters
  • Expanding the MCC starters and two (2) Circuit Breakers
  • Installation of electrical power to the new facilities
  • Installation of new control system for the facility
  • Installation of PLC in the control room with marshalling cabinet
  • Installation of new MCC to accommodate the new equipment
  • Construction of new storage Room