Project Description

Scope Of Work

LSTK project for constructing the off-site utilities required at the new desalination plant at Rabigh Refinery. :

  1. 2 Kms. RTR Piping; 36” dia.
  2. 5 Kms. CS Piping; from 3” to 20” dia.
  3. 110 Ton boiler and its control systems;
  4. Pumps;
  5. Foundations for boiler and other equipment

The work includes:

  • Sea water supply and return pipelines.
  • Process water piping from MED units battery limits to the distillate storage tanks.
  • Potable water piping from MED units battery limits to the portable water storage tanks.
  • Low pressure and medium pressure steam supply header.
  • Low pressure condensate header for steam traps.
  • Fire water supply lateral to MED units.Power supply to MED units.
  • Construction of pump shelter and foundation for new potable water transfer pumps.
  • Design and construct foundation for the new boiler.
  • Installation, testing, pre-commissioning, commissioning and performance testing of the new boiler.