Project Description

Scope Of Work

LSPB project for the upgrade of two grades of gasoline requirements at North and South Jeddah Bulk Plant, Jeddah Refinery, Yanbu Refinery and Bulk Plant and additional capacity requirements at Jeddah and Yanbu Bulk Plants.

The project includes:

  • Storage Tank Modifications including replacement of primary and secondary roof seals;
  • Twenty three loading skids;
  • Fourteen loading transfer pumps;
  • One online blending system;
  • Two dye injection system;
  • Dye detection system;
  • One foam skid;
  • New Substations;
  • Radar Tank Gauging System;
  • 12 Kms. Plant Piping, CS & RTR, from 3” to 24”
  • 96 Nos. Motor Operated Butterfly Valves (MOV), from 6” to 24”;
  • Two Wire Control Systems (TWCS);
  • Field Instrumentation including, Flow Control Valves, Flow Transmitters, Pressure Transmitters, Flow Meters, Pressure Switches, Pressure Gauges, Flow Gauges, Thermowells,  Limit Switches, Hand Switches, etc.
  • Fire Detection and Alarm Control System for Substations and for pumps;
  • Cathodic protection system for tanks and buried pipes;
  • Structural steel piperack fabrication and installation;
  • Communication/ intercom and CCTV systems;
  • HVAC systems at Substations