Project Description
Scope Of Work
LSTK Project involving design, engineering, procurement, construction, testing and commissioning of a waste water lagoon. The project involves:
Construction of a new waste water lagoon (120 m x 60 m x 2.35 m) into which the plant waste water is pumped through new 12” line header and from the lagoon to CTF through new 4” discharge line of the pumps 4706 A/B. The lagoon is facilitated with atomizer system. The new 6” line branching from 12” header is connected to the existing 6” header and thus the old waste water lagoon is isolated. The new 4” line is connected to the existing 12”-WW-7212, loading to the CTF. The new waste water lagoon is facilitated with ramp and access road to the pumps for maintenance purposes. Power Supply for the pumps as well as area lighting is provided from Substation IV (1 km. away).