Project Description
Scope Of Work
Project management, installation, testing and pre-commissioning of all the facilities related to the ethane metering project at Arabian Petrochemical Company (Petrokemya). The scope of this project covers:
- Ethane Metering System, which includes meter skid, flow computer cabinet, cables, wiring, access platforms, sun-shade, etc.
- 2 no. x Ethane Inlet Filters, including the loading of filter media and supply/install of access platform structure.
- 1 no. x Air Surge Drum that will be connected to Petrokemya existing instrument air system and supply dry air to new EIV and other users in the area.
- UPS System, which includes shelter, UPS, batteries, wiring, etc., including power supply feeders from existing substation to UPS Shelter.
- Analyzer System, which includes Gas Chromatograph, gas bottles, shelter, wiring, etc.
- Modification and refurbishment of the existing Metering Building to expand its size to accept the new flow computer cabinets, FCP, GCP and other panels required for this Project.
- Fire and Gas Detection System, including detectors in the metering compound yard.
- Extension of meter compound fence.
- Tie-ins to existing Ethane distribution piping, utility piping and relief header piping.
- Configuration of new I/O and graphics into existing DCS.
- Earthworks, foundations, surfacing, grading, structural steel, platforms, piping, wiring, lighting, grounding, and all other interconnections to make a mechanically complete system that is ready for commissioning.