Our outstanding performance is reflected in the completion of a large number of projects covering all aspects of engineering and construction works.

The following selection of recent projects reflects MRK's capabilities and the diversity of its work.

CONSTRUCTION OF WASTE WATER LAGOON

LSTK Project involving design, engineering, procurement, construction, testing and commissioning of a waste water lagoon. The project involves:

Construction of a new waste water lagoon (120 m x 60 m x 2.35 m) into which the plant waste water is pumped through new 12” line header and from the lagoon to CTF through new 4” discharge line of the pumps 4706 A/B.  The lagoon is facilitated with atomizer system.  The new 6” line branching from 12” header is connected to the existing 6” header and thus the old waste water lagoon is isolated.  The new 4” line is connected to the existing 12”-WW-7212, loading to the CTF.  The new waste water lagoon is facilitated with ramp and access road to the pumps for maintenance purposes. Power Supply for the pumps as well as area lighting is provided from Substation IV (1 km. away).

Start Date: 03/01- Completion Date: 09/01

INTERGRATED SECURITY SYSTEM PROJECT

Construction of duct banks, manhole, foundations, cable laying and termination, all earthworks such as excavation, backfilling, compaction;  installation of CCTV and security system in IBN ZAHR, SAMAD and PETROKEMYA..

Start Date: 06/97- Completion Date: 10/97

CONSTRUCTION OF TMSD CRITICAL MATERIAL WAREHOUSE

Turnkey project for the design and procurement for the construction and commissioning of Material Warehouse.  The work included civil, structural, mechanical, electrical and installation of HVAC systems.

Start Date: 07/94- Completion Date: 02/95